Technical Guidelines

AGREEMENT TO TECHNICAL GUIDELINES

These Technical Guidelines apply to the 3rd International Coal Mining Equipment Exhibition ("Coal Indonesia 2008") which be held on 18 - 21 November 2008 at Jakarta International Expo, Indonesia. By applying the Space at Coal Indonesia 2008, you agree to these Technical Guidelines.

GENERAL

Unless the Exhibitor take Indoor Sell Scheme, the Exhibitor himself shall take care of the installation, equipment, furnishings and fittings of the stand. The Exhibitor shall be entitled to build, equip and furnish his stand at his own discretion, taking into account the Rules and Regulations as instructions issued by Show Management with regard to safety, as well as general and aesthetic design. It is essential that exhibition stand must be properly build and decorated.

ACCESS

During build up period, Exhibition Hall is accessible via loading door on the back side of the hall. No one will be allowed to enter the Exhibition Hall without a valid Pass.

SCHEDULE

General build up schedule is 10.00am - 10.00pm. Separate specifics schedule in which each Exhibitor could enter the hall will be arranged and issued as Show Management deem necessary.

HALL SPECIFICATIONS

Loading Door: 4m width, 3.5m height.
Floor Structure: Concrete slab with floor hardener
Floor Loading: 225kg/sqm. If the exhibited objects exert a bigger load on the floors, the Exhibitor shall provide a load-distribution support
Roof Height: 6m.

STAND CONSTRUCTION

BUILD UP ACTIVITIES

PLACEMENT

STAND IDENTIFICATION

All stands shall be identified with company’s name and stand number and should be displayed in a design and place that shall be seen clearly. Exhibitor not take Space and Shell package are responsible to provide their own stand identification.

ELECTRICAL SUPPLY

Only the electrical contractor appointed by Show Management is permitted to carry out electrical work and installation at the Exhibition Hall. For Indoor Space and Shell package, electrical supply already include, for Exhibitor not take Indoor Space and Shell package, the prior request should be made on or before deadline and charges will be applied.

DISCLAIMER

All matters and questions not covered by this Technical Guidelines are at the discretion of Show Management. Show Management at any time may change, delete or add part or all of any provisions of this Technical Guidelines as Show Management deem necessary. Any or all alterations shall be equally binding all Exhibitors as the original Technical Guidelines.